View The Map

Subscribe to
Crossing Paths Blog by Email


Browse by



Selected Tag

Exton

All Tags 322


You are viewing 2 posts with the tag Exton

Chester County Officials Cut the Ribbon on Phase 3 of the CV Trail

    • Chester Valley Trail Exton Park
    • Chester Valley Trail Iron Lake/Exton Square
    • Chester Valley Trail Crossing Lincoln Highway
    • Chester Valley Trail
    • Chester Valley Trail Phase 3
  • Previous
  • Next

The wind and the rain did not dampen spirits at last week's ribbon cutting of of the Chester Valley Trail's phase 3 at Exton Park. County Commissioners, Bike Chester County, DCNR, West Whiteland Township and others were in attendence.

The new segment is only 3/4 mile long. But it connects the main trail to a long orphaned segment that stretches from Main St Exton to Iron Lake Rd and includes a pedestrian activated signalized crossing of Lincoln Highway (Business 30). As a result the trail has expanded to a length of 13 miles between Exton and King Of Prussia.

What makes the Chester Valley Trail so critical is that is in the County's main commercial corridor that is sandwiched between Route 202 and SEPTA's Paoli-Thorndale Line. As a result the trail provides a low stress non-motorized connection between the corridor's office complexes, retail establishments, residential developments and parks.

Chester County now is looking to expand further west. Design work to extend the tail up to the crossing of the Exton Bypass will begin next year. Meanwhile Montgomery County is part way through design for the four mile connection to the Schuylkill River Trail at the Norristown Transportation Center. Construction is expected to start in 2015. The Circuit Coalition will be hosting a walk through the future trail alignment on October 18. Bring your camera to take some before shots so you can brag that you walked it first.




 


A New Section of the Chester Valley Trail Opens

The Chester County Commissioners have issued a press release announcing the official opening of Phase 2 of the Chester Valley Trail from the Wegman's in Malvern to Old Eagle School Road in Tredyffrin Township. This new section increases the continuous length of the trail to 11 miles.

The easternmost section of Phase 2 from Old Eagle School to Warner Road is still officially closed and is considered an active construction zone. This closure may continue until the completion of the Warner Road Trailhead, which would be the likely site for what we hope is a springtime ribbon cutting. When opened, this section will connect the just-opened trail to the existing 1-mile stretch in King of Prussia. Biking to the mall will have never been easier!

The press release also mentioned the start of construction of Phase 3 in March. This will extend the west end of the trail from Exton Park to another stub section of the Chester Valley Trail at Iron Lake Rd. If all goes as planned that section of trail will be opened by this time next year.